100 Van Ness

100 Van Ness was a large scale multi-family housing project that included the flooring remodel for 450 apartment units in addition to the property’s common areas, gym and administration offices.

Our team’s proven track record of time management and on-time installations was once again the key ingredient to working with the many moving parts and multiple vendors required for a project of this size.

Specs: 
Broadloom carpet, rubber flooring, rubber base

Areas: 
450 apartment units along with common areas, gym, admin offices

Duration:  6 months

– John Cox, Project Manager


Have a project you need help with?

Erin Brennan

Erin Brennan is a Creative Consultant in San Francisco, CA who helps you grow your income + impact by standing out from the competition and connecting with your clients through compelling brand messages and strategic marketing. {Creating Brand Strategy, Brand Management, Business Strategy, and Strategic Marketing Plans, Squarespace Design}

San Jose Convention Center

A 225,000 sq. ft. project, the San Jose Convention Center was a high profile government project that required our team to coordinate schedules and work with as well as accommodate for other trades.

In the end everything worked to make the client experience as stress free as possible, keeping the project on-time and on-budget.  

Specs: 
Carpet tile, rubber base – 225,000 sq. ft.

Areas: 
All common areas in center along with admin spaces, meeting rooms

Duration: 1+ year

– John Cox, Project Manager


Have a project you need help with?

Erin Brennan

Erin Brennan is a Creative Consultant in San Francisco, CA who helps you grow your income + impact by standing out from the competition and connecting with your clients through compelling brand messages and strategic marketing. {Creating Brand Strategy, Brand Management, Business Strategy, and Strategic Marketing Plans, Squarespace Design}

Salesforce - One Rincon

Working on the Salesforce Postal Annex project posed several issues common with older construction. The concrete subfloors were in poor condition. The result meant removing up to 1.5” of the 1st floor slab and re-pouring it with subfloor leveling compound.

Our team was quick to resolve the issues on this project to keep it moving forward with minimal delays.

Specs: 
Carpet tile, Sheet Vinyl, LVT, Rubber Base

Areas: 
4 story – Stewart Street Postal Annex

Duration:  4-6 months

– Randy Cox, Project Manager


Have a project you need help with?

Erin Brennan

Erin Brennan is a Creative Consultant in San Francisco, CA who helps you grow your income + impact by standing out from the competition and connecting with your clients through compelling brand messages and strategic marketing. {Creating Brand Strategy, Brand Management, Business Strategy, and Strategic Marketing Plans, Squarespace Design}

Genentech - Buildings 46, 47, & 48

We worked with the Genentech design team to install the flooring in 3 of their buildings. A large scale project like this presents its own scheduling challenges and once we got started we ran into moisture problems.

Luckily our team was up for the task and was able to perform moisture testing and seal the floors so the project could be completed flawlessly and on schedule.

Specs: 
Carpet tile, sheet vinyl, VCT (new construction)

Areas: 
4 floors x 3 buildings

Duration:  1+ year

– Randy Cox, Project Manager


Have a project you need help with?

Erin Brennan

Erin Brennan is a Creative Consultant in San Francisco, CA who helps you grow your income + impact by standing out from the competition and connecting with your clients through compelling brand messages and strategic marketing. {Creating Brand Strategy, Brand Management, Business Strategy, and Strategic Marketing Plans, Squarespace Design}

Hyatt Regency

The Hyatt Regency project presented a number of challenges but our team was up for the job. Being an occupied installation, our team worked around both employees and guests to stay on schedule with minimal disruption to the guest experience.

Working to complete one floor per week, our team of trained union installers worked around the clock to make sure the job was completed on time and to spec.

Specs: 
Broadloom carpet, LVT (luxury vinyl tile), carpet tile

Areas covered: 
All 821 guest rooms including suites, ballrooms, meeting rooms, restaurants, admin offices, restrooms, bars

Duration:  1+ year

– Randy Cox, Project Manager


Have a project you need help with?

Erin Brennan

Erin Brennan is a Creative Consultant in San Francisco, CA who helps you grow your income + impact by standing out from the competition and connecting with your clients through compelling brand messages and strategic marketing. {Creating Brand Strategy, Brand Management, Business Strategy, and Strategic Marketing Plans, Squarespace Design}

1701 El Camino Real

This project had moisture problems which meant our team needed to do multiple moisture testing and eventually had to use a moisture barrier which added extra complexity.

In order to keep the project on schedule our team needed to manage the many city ordinances since it was located in a densely populated residential area in addition to working with and around multiple trades.

Specs: 
Sheet vinyl, LVT, linoleum, stair treads, rubber base – low income housing

Areas: 
80 units along with common areas

– John Cox, Project Manager


Have a project you need help with?

Erin Brennan

Erin Brennan is a Creative Consultant in San Francisco, CA who helps you grow your income + impact by standing out from the competition and connecting with your clients through compelling brand messages and strategic marketing. {Creating Brand Strategy, Brand Management, Business Strategy, and Strategic Marketing Plans, Squarespace Design}